+44 (0)2827641922
Facebook Twitter LinkedIn
Home » Projects » AIBP Aberdeen

Project Details

AIBP Aberdeen

Category: Fit out

Location: Dyce Drive, Aberdeen

PG Contracts were engaged by KDM Shopfitting to install a variety of elements of fitted joinery at a new office development for oil giant AKER Solutions. The contract lasted for 4 months and consisted of installation of kitchens in breakout areas, slatted oak ceilings and TV walls, lift door surrounds and acoustic panelling to the gymnasium. The works were spread over 3 buildings within the complex and 4 levels in each building.
 

Copright © 2015 - PG Contracts ltd.